Case studies

A guided investment workflow for MAG Capital, a lending application for Capital Access, hands-on AI enablement at Ascenda Talent, and Vagabod — a live product of my own. Each one says plainly what I built and the problem it was built to solve.

Guided investment workflow prototype

MAG Capital

MAG Capital logo

Turning an investment framework into guided software

The situation. MAG Capital's Practical Portfolio Optimisation framework is its own — a considered method for how client goals, strategic and tactical allocation, risk and governance fit together. The framework didn't need rewriting. What it needed was software that would walk an adviser through it from the first conversation to the final report, so prospective institutional partners could watch it work rather than read about it in a deck.

What I built

  • A five-stage, fifteen-screen guided workflow — client and portfolio, strategy, risk and decisions, transition, presentation and review — so the method runs in order with nothing skipped
  • The calculation engine lifted straight from MAG's own workbook, so every figure is deterministic and traceable back to the framework — no number is ever generated by AI
  • AI where it earns its place: plain-language monitoring flags drawn from the same compliance checks the engine runs, draft adviser commentary and discussion reports, and presentation views picked from an approved chart library on a plain-English request
  • CIO model portfolios, an Approved Product List with monitoring and exception review, policy checks and MAG-branded reports

Outcome

  • A working prototype MAG can demonstrate end to end on synthetic client scenarios
  • Prospective partners can follow the reasoning behind every portfolio decision and see how adviser judgement and central oversight fit together

Why it matters

  • This is what AI in a governed investment workflow should look like — the AI drafts, flags and explains, the model does the maths, and the adviser keeps the final call
  • The same pattern — a specialist's framework in, guided software out — applies to any firm with a method worth productising

A demonstration prototype built for MAG Capital on synthetic client data. It isn't a bank deployment, and no endorsement by any institution is implied.

Lending workflow application

Capital Access

Capital Access logo

Turning lending expertise into a practical workspace

The situation. Preparing a private lending deal means keeping a lot of moving parts in agreement — security details, facility sizing, fees, each funder's contribution and a succession of documents — as it moves from indicative terms to confirmed funding. Capital Access already had the expertise and the calculations. What it needed was one place where a whole deal could be prepared, checked and progressed without anything drifting between the spreadsheet and the paperwork.

What I built

  • Mapped the lending process with the team and carried the source calculation logic into the application, checked against their own workbook
  • Debt sizing, loan-to-value and net-proceeds calculations, with individual funding contributions, rates and a funding reconciliation
  • A guided deal workflow that separates early assumptions from confirmed funding and keeps supporting evidence beside the step it belongs to
  • Document generation with previews and version history — indicative terms, offer material, instruction packs and lender notices — so what was prepared at each point is never silently overwritten

Outcome

  • A working application that brings the core components of deal preparation together, tested from intake to completion on synthetic lending scenarios
  • An active build — refinement continues as it beds into daily use, with the focus on simpler operation and practical document handling

Why it matters

  • Calculation logic that lived in a spreadsheet now runs inside a workflow, with the evidence and the documents attached to it
  • The same approach suits any firm whose deals move through stages and whose numbers have to stay consistent across every document that goes out the door

An active client build. Final documents and transaction decisions stay with Capital Access.

Practical AI enablement

Ascenda Talent

Ascenda Talent logo

Making AI useful in the working day

The situation. Executive search is a relationship business — the value is in the conversations, the judgement and the trust, and no client should ever feel there's an AI behind the interaction. Christian Mengler at Ascenda Talent wanted the preparation and the admin around those conversations taken off the plate, without handing over the decisions that make a search worth paying for.

What I did

  • Set up and configured the AI and meeting tools on Christian's own machine, connected the calendar and reviewed the privacy settings so candidate information isn't used to train anyone's models
  • Tested voice input so dictation replaces typing, and showed how a recorded meeting becomes a structured recap and a drafted follow-up
  • Encoded that post-meeting workflow as a reusable skill, so it runs the same way every time without being rebuilt from scratch
  • Demonstrated a candidate report that brings a CV, interview notes and the brief criteria together for review — surfacing the facts and the gaps so the consultant makes the call

Outcome

  • A configured starting point and concrete, repeatable examples Christian can run without me in the room
  • A clear line between what to automate — brief synthesis, notes, report assembly, follow-ups — and what stays human: the calls, the cultural fit and the candidate decisions

Why it matters

  • Most firms don't need a platform first. They need the tools set up properly on their own machines, with someone showing them what good looks like
  • Privacy and human review were built in from day one, which is the only way AI belongs in a relationship business

AI advisory, tool configuration and workflow demonstrations — not a delivered recruitment platform.

Agentic database enrichment

Vagabod

7,986 gyms59 countries enriched

A live product, kept fresh by a team of agents

The situation. Vagabod is a real live site that helps travellers find casual gym access anywhere in the world — it solves the problem of gyms not advertising casual membership without a traveller enquiring first. My team of agents reaches out to gyms around the world in multiple languages and enriches a database with information not available from a simple google search or a gyms website.

The live Vagabod landing page — 'Find a gym anywhere, no contract BS' over a global gym search
The live Vagabod landing page — an enriched directory of gyms with casual access across dozens of countries.

What I built

  • Automated scraping + enrichment pipeline
  • Casual-membership pricing extraction per gym
  • Outreach pipeline to inquire about unadvertised casual offerings
  • Continuous re-enrichment as data drifts

Outcome

  • 7,986 gyms across 59 countries enriched
  • Directory kept fresh without manual entry
  • Self-service claim work flow for gym owners to keep their pages current

Why it matters

  • The same agentic enrichment applies to any large, complex dataset
  • over 10 Automated workflows & always on, running 24/7 on local LLMs hosted on private infrastructure, for free

Want to hear it from a client rather than from me? Email me and I’ll arrange a reference.

Request a client reference

Want work like this?

Book a discovery call and let's talk about what you're trying to build — advice, an application, or automation.